Emergency Readiness Checklist
40 questions. 15 minutes. The gaps the AHJ would find on a surprise visit.
How to use this
Walk your building with this checklist. Each "no" is a gap. Each gap is something your AHJ would cite on a surprise visit โ or that your insurance carrier would flag on a renewal walk.
This isn't a quote-capture tool. It's a real checklist. Print it. Use it. We'll happily run it for free as part of a Compliance Audit if you'd rather have a technician do the walk.
1. Fire alarm
- Is the system in normal status (no trouble, no supervisory, no alarm)?
- Is the last annual inspection within the past 12 months and on file?
- Are smoke detectors less than 10 years from manufacture?
- Is the communicator path tested daily (most modern panels auto-test)?
- Is the central station monitoring account current?
- Does the system have battery capacity calculations on file?
2. Sprinkler
- Are all main drain tests within the past 12 months and recorded?
- Are all control valves locked or sealed?
- Is the fire pump churn-tested weekly (if you have a fire pump)?
- Is the annual sprinkler ITM report on file?
- Are there any visible corrosion, leaks, or pipe damage?
- Is the fire department connection (FDC) clear, signed, and capped?
3. Fire extinguishers
- Are all extinguishers tagged within the past 12 months?
- Are monthly visual inspection punches current?
- Are extinguishers in their correct location and not blocked?
- Is travel distance to nearest extinguisher within NFPA 10 limits?
- Are required Class K extinguishers present in kitchens?
4. Emergency & exit lighting
- Is the monthly 30-second test being performed and logged?
- Is the annual 90-minute discharge test on file?
- Are all exit signs lit?
- Are emergency lights covering all required egress paths?
5. Fire doors & means of egress
- Are rated fire doors closed, latched, and self-closing?
- Are door labels intact and legible?
- Is the annual NFPA 80 inspection on file?
- Is the egress path clear (no storage in corridors, stairwells, or in front of exits)?
6. Kitchen suppression (if applicable)
- Is the semiannual suppression inspection on file?
- Is hood cleaning current (frequency varies by cooking volume per NFPA 96 ยง11.4)?
- Are appliance positions matched to the original suppression design?
- Is the gas/electric appliance shut-off interlock functional?
7. ERCES / BDA (if applicable)
- Is the annual ERCES test current?
- Is the ERCES panel showing normal status?
- Is your building in a jurisdiction that has recently adopted IFC ยง510 amendments?
8. Documentation
- Is there a single binder or digital folder with all current inspection reports?
- Are insurance carrier requirements documented?
- Is the AHJ contact known and on file?
If you have more than 5 "no"s
Most buildings have more gaps than the owner expects. If the count is over five, request a free compliance audit โ we'll prioritize the gaps that the AHJ would write you up for first.